Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the image-sizes domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/i-tw.com.tw/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ultimate-addons-for-gutenberg domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/i-tw.com.tw/httpdocs/wp-includes/functions.php on line 6114

Notice: 呼叫 _load_textdomain_just_in_time 函式的方式不正確。Text Domain 為 astra 的語言套件載入過早觸發,這通常是由於外掛或佈景主題某些程式碼中的指示器過早執行所造成,而語言套件應該在 init 動作之後才載入。 請參閱〈WordPress 的偵錯功能〉以進一步了解相關資訊。 (這項訊息新增於 6.7.0 版) in /var/www/vhosts/i-tw.com.tw/httpdocs/wp-includes/functions.php on line 6114

Deprecated: Creation of dynamic property nxs_wpAddnEngine::$k is deprecated in /var/www/vhosts/i-tw.com.tw/httpdocs/wp-content/plugins/nxs-snap-pro-upgrade/nxs-snap-pro-upgrade.php on line 11
中橫宜蘭支線坍方搶修 開放單線雙向通行 – 我是在地人

中橫宜蘭支線坍方搶修 開放單線雙向通行

Booking.com

中橫宜蘭支線6.25公里坍方路段,公路總局已清除落石開放通行。(記者江志雄翻攝)

2018-08-25 11:25

〔記者江志雄/宜蘭報導〕宜蘭縣中橫宜蘭支線(省道台7甲)6.25公里處,即大同鄉嘉蘭路段,今天凌晨2點因上邊坡坍方,造成道路雙向阻斷,公路總局緊急派員搶修。

公路總局估計,坍方土石約有1600立方公尺,出動重型機具清理,已在上午10點26分完成坍方搶救作業,開放單線雙向通行。(11:25更新)

相關影音

  • 中橫宜蘭支線6.25公里處坍方,造成交通阻斷,公路總局派員搶修。(記者江志雄翻攝)

    中橫宜蘭支線6.25公里處坍方,造成交通阻斷,公路總局派員搶修。(記者江志雄翻攝)

報導來源:自由時報【原文網址

Booking.com

發佈留言

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *

返回頂端